Redefining Energy Independence through EV charging, solar, battery storage, V2H, demand response, and service.
Call 855-373-9566
EV Charging · Philadelphia, Pennsylvania

EV Charger Installation in Philadelphia, PA

EV Charging Installers of America installs EV charging in Philadelphia for homes, multifamily buildings, workplaces, fleets, and commercial properties. We are a licensed electrical contractor, we pull the Philadelphia electrical permit for the work, we coordinate with PECO where the service or interconnection requires it, and we commission the system before handover.

Philadelphia projects are reviewed by address, service, building type, utility requirements, and scope. See coverage and credentials.

What we install in Philadelphia

One contractor for the charging equipment and the electrical work behind it.

Home Level 2 charging

Single-family and rowhouse installations, including panel evaluation, dedicated circuit, load calculation, and permit. Service upgrades are scoped when the existing service cannot support the load. Residential charging details.

Multifamily and workplace

Garage, lot, and surface-parking installations with load management, metering arrangements, and access rules that fit how the property is actually operated.

Commercial, fleet, and DC fast charging

Capacity planning, make-ready infrastructure, Level 2 and DCFC, utility coordination, commissioning, and maintenance. Commercial EV charging.

Storage, solar, and backup integration

Charging is often part of a larger electrical scope. We also install battery storage, solar PV, and vehicle-to-home backup. Battery storage · Solar PV.

Permits, inspection, and utility coordination

Philadelphia is a permit city. The paperwork is part of the job, not an afterthought.

What a Philadelphia installation involves

  • Philadelphia L&I electrical permit for the charging circuit. Qualifying EV charger work can fall under the city’s EZ Permit standard for electrical vehicle charger stations, which allows permits without full plans.
  • Load calculation and service review before equipment is ordered, so the charger is sized to the service that actually exists.
  • PECO coordination where a service upgrade, new service, or interconnection is required. Utility timelines run on the utility’s schedule, not ours.
  • Inspection and commissioning, including a functional charge test and handover of the equipment documentation.
  • Property rules for rentals, condominiums, and commercial sites, including who owns the equipment and who holds the account.
Discuss a Philadelphia Site
Published EVCIA commercial EV charging installation in Philadelphia, Pennsylvania
Published portfolio work. New projects are scoped on their own site conditions.

Philadelphia project experience

Our published portfolio includes commercial charging work in Philadelphia, alongside retail, workplace, multifamily, municipal, and DC fast-charging projects across the region. That field experience is why the assessment starts with the electrical service and the actual parking layout rather than a product catalog.

View the Installation Portfolio

How a Philadelphia project runs

Four stages, each with a decision point before the next one starts.

1. Site assessment

Address, service size and panel condition, parking layout, proposed charger locations, and how the property will use and bill the charging.

2. Scope and permit

Written scope with equipment, electrical work, permit responsibility, and utility steps identified. Permit is filed before construction.

3. Installation

Electrical work, equipment mounting, conduit and wiring, and coordination with the property, general contractor, or tenant as required.

4. Commissioning and handover

Inspection, functional charge test, network or account setup where applicable, and documentation of what was installed.

Common questions

Answers that apply to most Philadelphia projects.

Do I need a permit to install an EV charger in Philadelphia?

Yes for new charging circuits. Philadelphia requires an electrical permit for the work, and qualifying EV charger installations may use the city’s EZ Permit standard for electrical vehicle charger stations. We file the permit for the scope we perform.

Do you handle the PECO side?

We identify what the utility needs to review and coordinate the submission for the service or interconnection work in our scope. PECO sets its own review and scheduling timelines.

Can you install in a rowhouse or older Philadelphia building?

Often, yes. Older services and limited panel capacity are common here, so the assessment includes the service and grounding condition before we recommend equipment. Some projects need a service upgrade first.

Do you work with property managers and general contractors?

Yes. We scope to the property’s rules and the construction schedule, and we can coordinate with the site’s GC, electrician, or network provider where responsibilities overlap.

Start with the address and the electrical service

Send the property address, building type, and what you want to charge. We will tell you what the site can support and what the permit path looks like.